Plant site in the scenario: 16 Psyche, main asteroid belt
ScenarioEngineering
Station · Area 15 · Ingot bundling and strapping

Ingot gripper and strapping head

Area 15 · StationStation control programNot written yet
62.1kg
Row lifted per pick
1,932N
Clamp force (6 bar)
20s
Cycle per strap
DevicesPneumatic cylinders (2)Bistable valvePiloted check valves (4)Photoelectric part sensors (3)Wedge fingers and flexible padsStrapping head
01Engineering

What the station does

This station shows the gripper that lifts three ingots at once and the head that seals each strap.

The gripper lifts three 20.7 kg ingots at once. Thin wedge fingers slide into the narrow gap between rows, and two air cylinders close the jaw. The grip stays closed if power or air fails. The strapping head tensions each steel strap to 10 kN and seals it.

The ingot gripper down and closed on a pair of ingots at the pick, on the nest plate of the ingot conveyor. Render of the digital twin at the pick step, not a photo.
The ingot gripper down and closed on a pair of ingots at the pick, on the nest plate of the ingot conveyor. Render of the digital twin at the pick step, not a photo.
02

Step by step

20sCycle per strap
  1. A pusher lines up three ingots against a guide rail in 1.2 s.
  2. The jaw closes in 1.0 s, and three sensors must each see an ingot.
  3. A slow 20 mm check lift proves the grip.
  4. The robot places the row within ± 3 mm. One pick takes 18 s.
  5. The strapping head feeds, tensions, seals and cuts each strap in about 20 s.
  6. Three straps fit into the 90 s that the line allows for strapping.
Driven by the PLC
In the twin this station runs under its PLC program, signal by signal. The chart below is drawn from the station signal list. The area page has the film of the running twin, moved live by the PLC.
Enlarge
Signal sequence of one strapping cycle. Drawn from the station signal list, not a recording.
03Engineering

Specifications

The devices

Each device is a real catalogue product. Its own product page will follow on the products level.

DeviceRole
Pneumatic cylinders (2) Close the jaw with 483 N each.
Bistable valve Keeps the gripper state without power.
Piloted check valves (4) Trap the air so the clamp stays closed.
Photoelectric part sensors (3)Report a lost ingot at once.
Wedge fingers and flexible padsHold the row: 3 fingers, 3 sprung pads.
Strapping head Feeds, tensions, seals and cuts the strap.

Links lead to the makers' public product pages and are given for reference only. This site is independent work, not affiliated with, sponsored or endorsed by any manufacturer. The makers are responsible for the content of their pages. Trademarks belong to their owners.

The signals

SignalDirectionMeaning
Gripper closefrom PLCValve coil that closes the jaw.
Cylinder closed without part (A and B)to PLCJaw closed on nothing: no ingot held.
Part present 1 to 3to PLCA drop raises the part-lost alarm.
Row completeto PLCThird ingot in place at the pick stop.
Tension and sealfrom PLCTensions the strap, then seals and cuts it.
Strap endto PLCStrap coil empty, so the sequence stops.
Notes

About this page

Scenario

In the scenario, this gripper and this strapping head close every ingot bundle that leaves 16 Psyche.

Real devices, built from real data

Engineering

Every machine and device in this twin is a real industrial product from the makers' catalogues. They range from sensors, valves and drives to safety scanners, load cells and RFID readers. Each model is built from the product's published data: dimensions, sensing ranges, signals, rated values, parameters and timing.

The PLC programs use the devices' real interfaces and parameters. Before any hardware existed, the twin found hundreds of faults in the plant design and the programs. So a real commissioning would need fine tuning, not a redesign.

Where the work stands

Engineering
Process designComplete
Equipment selectionComplete (real catalogue products)
Device models and PLC driversBuilt and tested against the PLC
Area control programIn test against the PLC runtime
3D sceneBuilt (line scene), in test
Station detail scene (millimetre scale)Planned, not built yet
Station signal listWritten: 33 signals, signal layer generated
Station control programNot written yet